T5_micro-plot
Tree population micro-plots were established in 1988 and continued until 2008.
Fertilizer micro-plots were established in 2011.
Basic idea for the fertilizer micro-plots: Nitrogen is applied at different timings and amounts.
The micro-plots are located at the north end of each plot they are 47.8 ft (14.6 m) wide (east to west) x 50 ft (15 m) deep (north to south).
The micro-plot area are subdivided into six different micro-plots, six different N application timings or N application amounts.
Show
T7_micro-plots
The annually tilled 20 meter X 20 meter micro plot area.
The annually disturbed (tilled) (20 meter X 20 meter) areas (microplot area). Try to synchronize with Treatment 1 tillage.
synchronize
Show
LTER_Alleyway
The LTER alleyway is the area between plots planted to grass.
The grass is planted to support equipment and have the area look nice on a daily basis and for tours.
Show
T3PrairieStrips
Prairie Strips in the middle of all T3 plots of the MCSE.
Show
GLBRC_Trap_Crop_Area
Border planting around GLBRC site
Show
Field_98_(GLBRC_Intensive_Site_Location)
Field_98 Location of the GLBRC Intensive Field Site established in Spring of 2008. Field 98 is the I.D. number that the MSU KBS Dairy Farm used for this field.
Show