Listing Observations
| Date | Site | Observation Type | Comment | Areas | Material | Actions | |||
|---|---|---|---|---|---|---|---|---|---|
| 2002-05-10 | KBS | Planting Fertilizer Application | Planted corn on the main si... | T2 |
|
Show observation number 609 | |||
| 2002-05-10 | KBS | Planting Fertilizer Application | Finished planting corn on t... | T1 |
|
Show observation number 611 | |||
| 2002-05-08 | KBS | Soil Preparation | Soil finished T1 plots; ... | T1 |
|
Show observation number 143 | |||
| 2002-05-07 | KBS | Soil Preparation Planting Insecticide Application | Soil finished and planted c... | Resource_Gradient_Non-Irrigated |
|
Show observation number 607 | |||
| 2002-05-06 | KBS | Observation | Woolf Excavation (Kalamazoo... | LTER_Alleyway | Show observation number 2759 | ||||
| 2002-05-01 | KBS | Soil Preparation | Soil finished the nitrogen ... | B10 B11 B12 B13 B15 B16 B18 B19 B2 B4 B5 B7 B8 Resource_Gradient_Non-Irrigated |
|
Show observation number 141 | |||
| 2002-04-26 | KBS | Herbicide Application | Sprayed burndown on all rep... | T2 |
|
Show observation number 606 | |||
| 2002-04-25 | KBS | Soil Preparation | Chisel plowed and soil fini... | T7_micro-plots |
|
Show observation number 1002 | |||
| 2002-04-25 | KBS | Soil Preparation | Soil finished main site tre... | 2,4-D ECB T3R4 T4R6 |
|
Show observation number 230 | |||
| 2002-04-24 | KBS | Soil Preparation | Because of high numbers of ... | 2,4-D ECB T3R6 T4R6 |
|
Show observation number 229 | |||
| 2002-04-23 | KBS | Mowing | Wheat stubble from the 2001... | T2 |
|
Show observation number 228 | |||
| 2002-04-20 | KBS | Soil Preparation | Soil finished main site tre... | T3 |
|
Show observation number 139 | |||
| 2002-04-20 | KBS | Fertilizer Application | Applied Potash (0-0-60) at ... | T1 T2 T3 |
|
Show observation number 140 | |||
| 2002-04-19 | KBS | Soil Preparation | Chisel plowed T3 plots. ... | T3 |
|
Show observation number 148 | |||
| 2002-04-19 | KBS | Soil Preparation | Soil finished main site tre... | T1 T4 |
|
Show observation number 138 | |||
| 2002-04-18 | KBS | Soil Preparation | Chisel plowed T4 plots, all... | T4 |
|
Show observation number 137 | |||
| 2002-04-17 | KBS | Soil Preparation | Chisel plowed T1 plots. ... | T1 |
|
Show observation number 136 | |||
| 2002-04-16 | KBS | Soil Preparation | Chisel plowed all corn, soy... | B10 B11 B12 B13 B15 B16 B18 B19 B2 B4 B5 B7 B8 |
|
Show observation number 2755 | |||
| 2002-04-16 | KBS | Soil Preparation | Chisel plowed N-rate study ... | Resource_Gradient_Non-Irrigated |
|
Show observation number 2754 | |||
| 2002-04-15 | KBS | Burning | Burned all replications of ... | T7R1 T7R2 T7R3 T7R4 T7R5 T7R6 | Show observation number 231 | ||||
| 2002-04-11 | KBS | Observation | Installed new lysimeter box... | LTER_Alleyway | Show observation number 2753 | ||||
| 2002-03-18 | KBS | Planting | In the Biodiversity Study a... | B17 B3 B6 |
|
Show observation number 227 | |||
| 2001-11-26 | KBS | Planting | Planted annual rye in all r... | B5 |
|
Show observation number 261 | |||
| 2001-11-20 | KBS | Mowing | Mowed the alfalfa in the ly... | LYSIMETER_FIELD |
|
Show observation number 2693 | |||
| 2001-11-20 | KBS | Mowing | Mowed corn stalks all repli... | 2,4-D B11 B13 B15 B18 B5 B8 ECB Resource_Gradient_Non-Irrigated |
|
Show observation number 260 | |||
| 2001-11-09 | KBS | Harvest | Harvested the corn plots in... | B11 B13 B15 B18 B5 B8 ECB Resource_Gradient_Non-Irrigated |
|
Show observation number 259 | |||
| 2001-10-30 | KBS | Soil Preparation | Chisel plowed and field cul... | B1 |
|
Show observation number 642 | |||
| 2001-10-30 | KBS | Soil Preparation Planting | Because of perennial weeds ... | B16 |
|
Show observation number 643 | |||
| 2001-10-29 | KBS | Mowing | Mowed all replications of t... | B1 B2 T8 |
|
Show observation number 570 | |||
| 2001-10-04 | KBS | Soil Preparation Planting | Chisel plowed the wheat plo... | B10 B17 B20 B4 B7 |
|
Show observation number 641 |