Skip to main content

Show Observation

User: Ethan Rocklin

Created on: 2026-05-11

Observation Date 2026-05-08

Comment:
Chisel Plowed the LTER Treatment 4 reps (1, 2, 3, 4, and 6). Rep 5 was done on 5/7/26. Reps 1, 2, 4, 3 and 6 were done on 5/8/26. Chisel plowed to a depth of 6-7 inches. Plots were chisel plowed North to South. Three additional ”headland” passes were plowed E-W on the north and south edges of each plot. Prairie strips were avoided completely.

Areas:
T4

Observation Type:
Soil Preparation Mechanical Weed Control

Activities:

Worker: Ethan Rocklin
Equipment: John Deere 7520 Tractor
Equipment: John Deere 714 Chisel plow

Attachments:

Related Observations New observation Edit List Observations