Show Observation
User: Jarrod Rhoades
Created on: 2025-05-12
Observation Date 2025-05-12
Comment:
Chisel Plowed the annually tilled micro-plot area in the LTER Main Site Treatment T7 plots (5, 1, 3, 4, 2, and 6), Early Successional plots. Micro-plots were chisel plowed from South to North starting in the Southeast corner of micro-plot, with a double headland pass on the North edge of micro-plots. One headland pass on the South edge of the plot.
Soil finished the same plots in the afternoon in the same order. The same way of working them South to North with one headland pass on the south side and two headland passes on the north side trying to alternate directions on headland pass from chisel plowing if trees weren't in the way.
Areas:
T7_micro-plots
Observation Type:
Soil Preparation
Mechanical Weed Control
Activities:
Attachments: