Show Observation
User: Jarrod Rhoades
Created on: 2025-04-17
Observation Date 2025-04-17
Comment:
Applied Lime to LTER Main Site treatment T1 and T2 all reps with pelletized lime.
Lime was applied with the Gandy Orbit Air with 30 ft boom. Target application rate was 500 lb per acre.
Lime was applied with two passes of 250 lb/A on each pass.
Applications started the afternoon of 4/14/25 and were finished on 4/17/25 see attached map for exact days of each plot.
Application was made in C2 with 1250 rpm going 3 mph. CFR was .0155 with a bulk density of 80 lb/cubic ft for the Rate Controller.
Areas:
T1 T2
Observation Type:
Fertilizer Application
Activities:
Worker: Jarrod Rhoades
Equipment: John Deere 7420b Tractor (14.9 R 46 back tire size)
Equipment: Gandy Orbit-Air (30' boom)
Material: pelleted lime
@ 500.0
pound per acre
Attachments: