Show Observation
User: Todd Martin
Created on: 2025-01-08
Observation Date 2022-10-02
Comment:
Hand biomass sampled treatment 11, One square meter, (0.5m X 2m), at 2 stations at locations in plot indicated on protocol map. Biomass was cut 6" above ground level with hedge clippers, and placed in burlap bag to be dried then weighed.
Areas:
MNG11
Observation Type:
Sampling
Activities:
Worker: Todd Martin
Worker: Chris Robbins
Attachments: