Skip to main content

Show Observation

User: Todd Martin

Created on: 2025-01-08

Observation Date 2021-10-19

Comment:
Hand biomass sampled treatment 11, One square meter, (0.5m X 2m), at 2 stations at locations in plot indicated on protocol map. Biomass was cut 6" above ground level with hedge clippers, and placed in burlap bag to be dried then weighed.

Areas:
MCG11

Observation Type:
Sampling

Activities:

Worker: Chris Robbins
Worker: Todd Martin

Attachments:

Related Observations New observation Edit List Observations