Show Observation

User: Ethan Rocklin

Created on: 2024-04-24

Observation Date 2024-04-24

Comment:
Chisel Plowed the annually tilled micro-plot area in the LTER Main Site Treatment T7 plots (5, 1, 3, 4, 2, and 6), Early Successional plots. Micro-plots were chisel plowed from South to North starting in the Southeast corner of micro-plot, with a double headland pass on the North edge of micro-plots. One headland pass on the South edge of the plot. Chisel plowing began at 10:30 am and ended at 2:00 pm. Weather at 10:30 am: Cloudy Temperature 38.4 °F Wind Speed (3m) 9.78 MPH Wind Direction North Relative Humidity 74.5%.

Areas:
T7_micro-plots

Observation Type:
Soil Preparation Mechanical Weed Control

Activities:

Worker: Ethan Rocklin
Equipment: John Deere 7520 Tractor
Equipment: John Deere 714 Chisel plow

Attachments:

Related Observations New observation Edit List Observations