Chisel Plowed the LTER Treatment 3 all reps (3,1,2,4,5,6).
Reps 1 and 2 were done on 5/11/23. Reps 3,4,5 and 6 were done on 5/12/23.
Chisel plowed to a depth of 6-7 inches. Plots were chisel plowed North to South incorporating the existing clover.
Two additional ”headland” passes were plowed E-W on the north and south edges of each plot.
Prairie strips were avoided completely.
Soil moisture conditions were great to incorporate biomass.
Areas:
T3 T3_micro-plots
Observation Type:
Soil Preparation
Mechanical Weed Control
Activities:
Worker: Jarrod Rhoades
Equipment: John Deere 7520 Tractor
Equipment: John Deere 714 Chisel plow