Show Observation
User: Jarrod Rhoades
Created on: 2023-05-08
Observation Date 2023-05-05
Comment:
Chisel Plowed the annually tilled micro-plot area in the LTER Main Site Treatment T7 plots (2,4,3,1,5 and 6), Early Successional plots.
Micro-plots were chisel plowed from South to North starting in the Southeast corner of micro-plot, with a double 'headland pass' on the North edge of micro-plots. One 'headland pass' on the South edge of the plot.
Weather at 8:30 am, clear. Temperature 52°F Wind Speed (3m) 4.87 MPH Wind Direction South East RH 70.4%.
Areas:
T7_micro-plots
Observation Type:
Soil Preparation
Mechanical Weed Control
Activities:
Worker: Jarrod Rhoades
Equipment: John Deere 714 Chisel plow
Equipment: John Deere 7520 Tractor
Worker: Ethan Rocklin
Attachments: