Show Observation
User: Ethan Rocklin
Created on: 2023-04-19
Observation Date 2023-04-19
Comment:
Fertilized LTER Main Site treatment T1 and T2, T1R6, T2R5, T1R5, T2R2 with potash (0-0-60) at 85 lb/A.
Application began at 10:15 am and concluded at 2:15 pm.
Application was done at 4 mph, Gandy metercal set to 201, density of potash was 70 lbs/cubic ft.
Weather at 10:00 am 4/19/23
Temperature: 38.9°F
Wind Speed (5 minute at 3m) : 8.48 mph
Wind Direction: South East
Relative Humidity: 68.7%
Weather Conditions at 2:30pm:
Temperature: 55.8° F;
Wind Speed (5 minute at 3m) : 9.05 mph
Wind Direction: South East
Relative Humidity: 40.3%
Areas:
T1R5 T1R6 T2R2 T2R5
Observation Type:
Fertilizer Application
Activities:
Attachments: