Soil finished the annually tilled micro-plot area in the LTER Main Site Treatment T7 Early Successional, Reps; (4,5,2,3,1 and 6) plots.
Micro-plots were soil finished from south to north in pass one and north to south in pass two.
Headlands were soil finished twice going east to west on each north and south end of the plots.
Two passes were required to break up large soil chunks.
Equipment used was the JD7420B tractor and the JD960 10' field cultivator.
Weather conditions on 05, 20 Sunny 83.8 degrees F, Winds 12.4 mph out of the South 59.5% Relative Humidity