Show Observation
User: Todd Martin
Created on: 2021-10-29
Observation Date 2021-10-20
Comment:
Hand biomass sampled treatment 11, One square meter, (0.5m X 2m), at 2 stations per split at locations in plot indicated on protocol. Biomass was cut 6" above ground level with hedge clippers, and placed in burlap bag to be dried.
Areas:
MSG11
Observation Type:
Harvest
Activities:
Worker: Chris Robbins
Attachments: