Show Observation
User: Todd Martin
Created on: 2017-10-16
Observation Date 2017-10-13
Comment:
Hand biomass sampled treatment 11, One square meter, (0.5m X 2m), at 3 stations at locations in plot indicated on protocol. Biomass was cut 6" above ground level with hedge clippers, and placed in paper bag to be dried.
Areas:
MSG11
Observation Type:
Sampling
Activities:
Worker: Sichao Wang
Worker: Pavani Tumbalam
Attachments: