Harvest GLBRC main site treatments G5, G7, G9, and G10 main plots. Reps 1, 2 and 5 were harvested on November 1, 2016. G5R3, G7R3, and G9R3 were harvested on November 2, 2016. G10R3 and all of rep 4 was harvested on November 7, 2016. All plots were harvested with the JD 7350 self-propelled forage harvester equipped with a JD 676 cutting head. Plant material was chopped into a Gnuse forage wagon that is fitted with load cells to determine harvested biomass. Cutting height of remaining plant stubble was 4-6 inches in all reps. Grab samples from each rep was placed in paper bags weighed for wet weight and placed in plant dryer and reweighed to determine percent moisture for each replication.

Areas:
G10 G5 G7 G9

Observation Type:
Harvest

Activities:

Worker: Ryan Anthony
Worker: Justin Mezo
Equipment: GNUSE Forage Wagon
Equipment: John Deere 7350 Self-propelled forage harvester/chopper

Attachments:

Related Observations New observation Edit List Observations