Show Observation
User: Todd Martin
Created on: 2016-01-22
Observation Date 2015-10-16
Comment:
Hand biomass sampled treatment 11, One square meter, at 3 stations at locations in plot indicated on protocol. Biomass was cut 6" above ground level with hedge clippers, and placed in paper bag to be dried.
Areas:
MNG11
Observation Type:
Sampling
Activities:
Attachments: