Show Observation
User: Joe Simmons
Created on: 2015-10-06
Observation Date 2015-10-06
Comment:
Soil finished the LTER main site treatment T3, all replications, reps 5, 4, 2, 3, 1, and 6.
Reps 5 and 4 was soil finished twice on October 5, 2015.
Reps 2, 3, 1, and 6 were soil finished once on October 6, 2015.
A single pass was made across the plots with the soil finisher.
Equipment used JD 7520 tractor and the JD 726 soil finisher.
Plots were soil finished N-S with 2 headland passes going E-W on both north and south side of each plot.
All plots were finished to a 4” depth (soil finisher at ”A-B” setting), disc gang was set all the way down.
Speed was 5.5 - 6.0 mph.
Areas:
T3
Observation Type:
Soil Preparation
Activities:
Attachments: