Show Observation
User: Joe Simmons
Created on: 2015-06-04
Observation Date 2015-06-03
Comment:
Soil finished the LTER main site treatment T4, all replications, with a single pass with the JD 7520 tractor and the JD 726 soil finisher.
Replications 6, 1, and 5 were soil finished by Joe Simmons on May 3, 2015.
Replications 2, 3, and 4 were soil finished by Justin Mezo on June 4, 2015.
Plots were soil finished N-S with 2 headland passes going E-W on both north and south side of each plot.
All plots were finished to a 5-6ā depth (soil finisher at āC-Dā setting), disc gang was set all the way down.
Speed was 5.0 - 5.5 mph depending on soil conditions.
Areas:
T4
Observation Type:
Soil Preparation
Activities:
Attachments: