Show Observation
User: Brandon Mezo
Created on: 2014-05-30
Observation Date 2014-05-29
Comment:
Soil finished the LTER main site treatment T4, all replications as follows (6, 5, 3, 2, 4, 1) with a single pass with the JD7520 tractor and the JD726 soil finisher. Plots were soil finished on an angle to the NE-SW with 1 headland pass going E-W on both north and south side of each plot. All plots were finished to a 6ā depth (soil finisher at āCā setting), disc gang was set just at F. Speed was 5-5.5 mph depending on soil conditions. The tractor and soil finisher were both washed prior to entering the field to comply with the organic regulations.
Areas:
T4
Observation Type:
Soil Preparation
Activities:
Attachments: