Lysimeter's were installed in the LTER Main Site throughout the last two weeks on the North edges of treatments T1 and T2 reps (1,2,3,4). Two pre-cast cement ground vaults were installed on the North edge of treatments T1 and T2 reps (1,2,3,4) within the last 2 days that the lysimeters are ran to.