Show Observation
User: Joe Simmons
Created on: 2014-03-19
Observation Date 2004-10-15
Comment:
Chisel plowed the LTER east - west alleyways around the T4 plots.
Because T4 plots are organic we could not spray them on September 30, 2004.
I think that we sprayed half of the alleyway and chisel plow the other half of the alleyway or chisel plowed 1/3 of the alleyway and sprayed 2/3 of the alleyway.
We only chisel plowed around T4 plots, all other plots had the grass and weeds sprayed.
Areas:
LTER_Alleyway
Observation Type:
Soil Preparation
Activities:
Worker: Joe Simmons
Equipment: John Deere 7520 Tractor
Equipment: John Deere 714 Chisel plow
Attachments: