User: Joe Simmons

Created on: 2014-03-17

Observation Date 2007-11-05

Comment:
Soil finished the old N-rate study area (the area on the west side of the LTER main drive just inside the LTER main gate). The purpose of this field activity was to prepare this field area for planting of crops/treatments for the new LTER Cellulosic Ethanol Study (CE) in the spring of 2008.

Areas:
CE

Observation Type:
Soil Preparation

Activities:

Worker: Jim Stoneburner
Equipment: John Deere 726 15'9" soil finisher
Equipment: John Deere 7520 Tractor

Attachments: