Show Observation
User: Joe Simmons
Created on: 2012-05-18
Observation Date 2012-05-18
Comment:
Soil finished the LTER main site treatments T3 and T4, all replications. T3, (reps: 6, 1, 2, 3, 4, and 5), and T4 (reps: 1, 2, 3, 4, 5, and 6). Soil finisher was power washed prior to entering organic plots. All plots had a single pass with the JD7520 tractor and the JD726 soil finisher. Plots were soil finished N-S with a single headland pass going E-W on both north and south side of each plot. Soil finisher settings were D for the discs and C for the shovels. Speed was 4.5-5.5 mph depending on the soil conditions. Soil finished at 6 inches (15.24 cm) deep. Field time for each treatment was around 4-4.5 hours. That 4-4.5 hours does not include equipment maintenance i.e. greasing, fueling, cleaning...
Areas:
T3 T4
Observation Type:
Soil Preparation
Activities:
Attachments: