Skip to main content

Show Observation

User: Joe Simmons

Created on: 2007-06-08

Observation Date 2004-04-28

Comment:
Scott Kokx soil finished, twice, both N-rate study areas, irrigated and non-irrigated. The N-rate study area is the area just inside the LTER south main gate on the west side of the drive. Soil finished with the JD7520 tractor and JD726 soil finisher. Working depth was 5 inches (12.7 cm).

Areas:
Resource_Gradient-Irrigated Resource_Gradient_Non-Irrigated

Observation Type:
Soil Preparation

Activities:

Worker: Scott Kokx
Equipment: John Deere 7520 Tractor
Equipment: John Deere 726 15'9" soil finisher

Attachments:

Related Observations New observation Edit List Observations