Comment:
Soil finished the LTER Main Site Treatment T7 Early Successional plot, microplot areas. Microplots were soil finished with deep passes from N to S to reduce soil berm buildup on the N side of the plots, then finished with shallow passes from S to N to leave the microplots smooth without tire marks. Lastly, this was followed up with a headland pass from W to E. Equipment used was the JD6420 tractor and the JD960 10' field cultivator (small soil finisher)

Areas:
T7_micro-plots

Observation Type:
Soil Preparation

Activities:

Worker: Peter Hudy
Equipment: John Deere 6420 Tractor
Equipment: John Deere 960 10' field cultivator