Show Observation
User: Peter Hudy
Created on: 2011-05-10
Observation Date 2011-05-09
Comment:
Chisel plowed the LTER Main Site Treatment T7 successional annually tilled 20 meter x 20 meter microplot area, all replications (reps 1, 5, 2, 4, 3 and 6).
Replications 1 and 5 were chisel plowed on May 7 but work stopped due to rain showers.
The remaining four replications were chisel plowed in the afternoon of May 9.
Chisel plowed with a headland pass on the south side followed by successive passes from S to N accross the entire microplot area and then a final headland pass on the north side.
Chisel plowed with the JD7520 tractor and JD714 chisel plow.
Areas:
T7_micro-plots
Observation Type:
Soil Preparation
Activities:
Attachments: