Show Observation

User: Peter Hudy

Created on: 2011-05-10

Observation Date 2011-05-09

Comment:
Chisel plowed the LTER Main Site Treatment T7 successional annually tilled 20 meter x 20 meter microplot area, all replications (reps 1, 5, 2, 4, 3 and 6). Replications 1 and 5 were chisel plowed on May 7 but work stopped due to rain showers. The remaining four replications were chisel plowed in the afternoon of May 9. Chisel plowed with a headland pass on the south side followed by successive passes from S to N accross the entire microplot area and then a final headland pass on the north side. Chisel plowed with the JD7520 tractor and JD714 chisel plow.

Areas:
T7_micro-plots

Observation Type:
Soil Preparation

Activities:

Worker: Peter Hudy
Equipment: John Deere 7520 Tractor
Equipment: John Deere 714 Chisel plow

Attachments: