Skip to main content

Show Observation

User: Peter Hudy

Created on: 2011-05-06

Observation Date 2011-05-06

Comment:
Soil finished the GLBRC Scale Up Field Marshall Farm Field M1, three gas testing areas. Each of the three plot is approximately 15' wide by 50' long and was soil finished in a total of four passes: two passes from S to N on the east side of the plot and two passes from N to S on the west side of the plot. Equipment used was the JD6420 tractor and the JD960 10' field cultivator.

Areas:
M1

Observation Type:
Soil Preparation

Activities:

Worker: Peter Hudy
Equipment: John Deere 6420 Tractor
Equipment: John Deere 960 10' field cultivator

Attachments:

Related Observations New observation Edit List Observations