Show Observation
User: Peter Hudy
Created on: 2010-10-06
Observation Date 2010-10-05
Comment:
Soil Finished LTER Main Site Lysimeter catch area in preparation to planting turf grass. Passes were made in multiple directions as needed to most effectively loosen the soil all around the access hatch and the weather station. On the south end, when we finished the lysimeter catch area, the alley way between the lysimeter area and the N-rate (fertilizer gradient study) was worked up from east to west.
Areas:
LYSIMETER_FIELD
Observation Type:
Soil Preparation
Activities:
Worker: Peter Hudy
Equipment: John Deere 7520 Tractor
Equipment: John Deere 726 15'9" soil finisher
Attachments: