Show Observation
User: Peter Hudy
Created on: 2010-07-20
Observation Date 2010-07-17
Comment:
Harvested the LTER Main Site micro-plots in treatments T3 and T4. For each micro-plot, a 5' wide strip the length of the plot was cut using the Kincaid combine. Moisture content was determined by using the on-board system.
Areas:
T3 T4
Observation Type:
Harvest
Activities:
Worker: Joe Simmons
Equipment: Kincaid 8XP Plot Combine
Attachments: