Show Observation
User: Peter Hudy
Created on: 2010-05-25
Observation Date 2010-05-24
Comment:
Soil Finished all LTER Main Site Biodiversity plots except those already planted to winter wheat (B4, B7, B10, B14, B17, and B20) and fall fallow plots (B1). Plots which were soil finished were B2 (102, 206, 316, 402), B3(111, 203, 306, 403), B5 (114, 217, 312, 405), B6 (107, 207, 317, 406), B8 (118, 214, 310, 408), B9 (119, 205, 314, 409), B11 (110, 216, 309, 411), B12 (109, 202, 313, 412), B13 (113, 212, 319, 413), B15 (112, 213, 301, 415), B16 (101, 210, 308, 416),
B18 (108, 208, 311, 418), B19 (103, 218, 315, 419), B21 (100, 200, 300, 421). Soil finished with the JD6420 tractor and the JD960 soil finisher to 6” depth. About midway through soil finishing, switched to the JD7420b tractor.
Areas:
B1 B12 B13 B15 B16 B18 B19 B2 B3 B5 B6 B8 B9
Observation Type:
Soil Preparation
Activities:
Attachments: