Show Observation
User: Staff
Created on: 2007-08-01
Observation Date 1988-07-01
Comment:
{{PL: Beginning about 9:30 pm Friday evening and completing late morning on Saturday the linear was run over the Ancillary site studies again (2nd time). Speed setting 3was 2% and based on the first irrigation we should have applied about 1.9 inches of water. }}
Areas:
ANC
Observation Type:
Irrigation
Activities:
Worker: unknown
Equipment: irrigator
Material: water
@ 1.9
inch per acre
Attachments: