2008-06-18 Planting Jerry Stewart, from Native Connections, Three Rivers, MI, www.nativeconnection.net, planted G7 and G10, all reps, on June 18, 2008, and planted G5 plots, all reps, on June 19, 2008. Species list: http://data.sustainability.glbrc.org/protocols/144 Row spacing: solid seeded. Tillage: conventional. Jerry planted a rep of each treatment and than he would vacuum the seed out of the drill between each rep and weigh the seed to see how much seed/Acre was planted. The numbers below is what Jerry provided after he completed planting. G5: R1 7.29 lbs/A, R2 6.82 lbs/A, R3 6.14 lbs/A, R4 7.29 lbs/A, and R5 6.36 lbs/A. G7: R1 6.93 lbs/A, R2 6.64 lbs/A, R3 6.64 lbs/A, R4 9.07 lbs/A, and R5 10.26 lbs/A. G10: R1 6.43 lbs/A, R2 7.05 lbs/A, R3 9.42 lbs/A, R4 6.43 lbs/A, R5 8.31 lbs/A. Because of a heavy/hard rain event within two weeks of planting the G5, G7, and G10 plots in June 2008 a lot of the seed ended up in the alleyway or adjacent plots. After evaluating the plant stands within the plots in June of 2009 we determined that the desired plant stands were not at the desired levels so the decision was made to replant G5, G7, and G10 plots. KBS staff, MSU campus staff, and Jerry Stewart all provided input into the decision to replant the G5, G7, and G10 plots. Jerry Stewart, from Native Connections, Three Rivers, MI, www.nativeconnection.net, replanted G10, all reps, on July 15, 2009. G5 and G7 were replanted on July 7, 2009. 2009 Tillage: No-till, all replanting in 2009 of G5, G7, and G10 plots were no-tilled. 2008 tillage were conventional tilled. 2009 row spacing: for all replanting in 2009 of G5, G7, and G10 plots were planted in 7.5 inch rows. 2008 row spacing: in 2008 G5, G7, and G10 plots were solid seeded. Jerry planted a rep of each treatment and than he would vacuum the seed out of the drill between each rep and weigh the seed to see how much seed/Acre was planted.
2010-04-29 Planting Switchgrass (variety Cave-in-rock) was planted.
2009-07-07 Planting Because of a heavy/hard rain event within two weeks of planting the G5, G7, and G10 plots in June 2008 a lot of the seed ended up in the alleyway or adjacent plots. G7 species planted http://data.sustainability.glbrc.org/protocols/144 After evaluating the plant stands within the plots in June of 2009 we determined that the desired plant stands were not at the desired levels so the decision was made to replant G5, G7, and G10 plots. KBS staff, MSU campus staff, and Jerry Stewart all provided input into the decision to replant the G5, G7, and G10 plots. Jerry Stewart, from Native Connections, Three Rivers, MI, www.nativeconnection.net, replanted G5 and G7, all reps, on July 7, 2009. G10 was replanted on July 15, 2009. 2009 Tillage: No-till, all replanting in 2009 of G5, G7, and G10 plots were no-tilled. 2008 tillage were conventional tilled. 2009 row spacing: for all replanting in 2009 of G5, G7, and G10 plots were planted in 7.5 inch rows. 2008 row spacing: in 2008 G5, G7, and G10 plots were solid seeded. Jerry planted in rep of each treatment and than he would vacuum the seed out of the drill between each rep and weigh the seed to see how much seed/Acre he planted.
2009-07-15 Planting Because of a heavy/hard rain event within two weeks of planting the G5, G7, and G10 plots in June 2008 a lot of the seed ended up in the alleyway or adjacent plots. G10 species: http://data.sustainability.glbrc.org/protocols/144 After evaluating the plant stands within the plots in June of 2009 we determined that the desired plant stands were not at the desired levels so the decision was made to replant G5, G7, and G10 plots. KBS staff, MSU campus staff, and Jerry Stewart all provided input into the decision to replant the G5, G7, and G10 plots. Jerry Stewart, from Native Connections, Three Rivers, MI, www.nativeconnection.net, replanted G10, all reps, on July 15, 2009. G5 and G7 were replanted on July 7, 2009. 2009 Tillage: No-till, all replanting in 2009 of G5, G7, and G10 plots were no-tilled. 2008 tillage were conventional tilled. 2009 row spacing: for all replanting in 2009 of G5, G7, and G10 plots were planted in 7.5 inch rows. 2008 row spacing: in 2008 G5, G7, and G10 plots were solid seeded. Jerry planted in rep of each treatment and than he would vacuum the seed out of the drill between each rep and weigh the seed to see how much seed/Acre he planted.
2008-06-18 Planting Jerry Stewart, from Native Connections, Three Rivers, MI, www.nativeconnection.net, planted CE11, all reps, on June 18, 2008. This treatment was planted by hand. All equipment was owned and operated by Native Connections. , Native Connections (Jerry and one assistant) planted all remaining treatments, all reps, in the CE study on June 19, 2008. He planted the switchgrass and matching GLBRC and LTER CE treatments with the JD tractor and drill. The remaining treatments were planted by hand. All equipment was owned and operated by Native Connections.
2010-04-30 Planting Switchgrass (variety Cave-in-rock) was planted.
2008-06-19 Planting Jerry Stewart, from Native Connections, Three Rivers, MI, www.nativeconnection.net, planted G5 plots, all reps, on June 19, 2008. Planted G7 and G10, all reps, on June 18, 2008. Switchgrass variety Cave-in-rock was planted in G5. Row spacing: solid seeded. Tillage: conventional. Jerry planted in rep of each treatment and than he would vacuum the seed out of the drill between each rep and weigh the seed to see how much seed/Acre he planted. The numbers below is what Jerry provided after he completed planting. G5: R1 7.29 lbs/A, R2 6.82 lbs/A, R3 6.14 lbs/A, R4 7.29 lbs/A, and R5 6.36 lbs/A. G7: R1 6.93 lbs/A, R2 6.64 lbs/A, R3 6.64 lbs/A, R4 9.07 lbs/A, and R5 10.26 lbs/A. G10: R1 6.43 lbs/A, R2 7.05 lbs/A, R3 9.42 lbs/A, R4 6.43 lbs/A, R5 8.31 lbs/A. Because of a heavy/hard rain event within two weeks of planting the G5, G7, and G10 plots in June 2008 a lot of the seed ended up in the alleyway or adjacent plots. After evaluating the plant stands within the plots in June of 2009 we determined that the desired plant stands were not at the desired levels so the decision was made to replant G5, G7, and G10 plots. KBS staff, MSU campus staff, and Jerry Stewart all provided input into the decision to replant the G5, G7, and G10 plots. Jerry Stewart, from Native Connections, Three Rivers, MI, www.nativeconnection.net, replanted G5 and G7, all reps, on July 7, 2009. G10 was replanted on July 15, 2009. 2009 Tillage: No-till, all replanting in 2009 of G5, G7, and G10 plots were no-tilled. 2008 tillage were conventional tilled. 2009 row spacing: for all replanting in 2009 of G5, G7, and G10 plots were planted in 7.5 inch rows. 2008 row spacing: in 2008 G5, G7, and G10 plots were solid seeded. Jerry planted in rep of each treatment and than he would vacuum the seed out of the drill between each rep and weigh the seed to see how much seed/Acre he planted.
2010-06-06 Planting prairie planted. See species list: http://data.sustainability.glbrc.org/protocols/142
2010-06-05 Planting Prairie was planted. See species list: http://data.sustainability.glbrc.org/protocols/142
2018-06-08 Planting Planted sorghum in G2 plots.
2022-11-10 Planting Drill VNS rye and 3 lbs. camelina cover crop.
2022-11-10 Planting Drill whale wheat and camelina cover crop at 1 inch. Drill was clean.
2022-12-07 Planting Plant prairie seed in strips and plots to augment initial planting. 1 lb. PLS prairie blend and 14 lbs. oats and annual rye grass per acre.
2024-06-04 Planting Planted soybean variety trial on the east side of the FSC F2 field. Treatment list: Trt 1 Pioneer P18A73E Enlist E3 Soybean seed; Trt 2 LTAR BAU Soybean seed; Trt 3 LTAR ASP Soybean seed; Trt 4 Blue River 2155N Organic Soybean seed. Border Rows are P18A73E Enlist E3 Soybean seed. Target Planting Population was 150,000 plants per acre. Planted in 30 inch row spacing with drill set on 50. Plots were soil finished with 10 ft soil finisher twice before planting.