Name: John Deere 7600 Tractor

2002-10-22 Soil Preparation Chisel plowed treatment B1, fall fallow, in the biodiversity study; I would guess that we chisel plowed with the JD 7600 tractor and JD 714 chisel plow; (We did not take delivery of the JD 7520 tractor until March 30, 2003).

1996-06-20 Mechanical Weed Control {{PL: Cultivated TRT 3 replicate 6 with red cultivator. Also cultivated TRT 3 reps 1-5 with the hinicker and 7600JD.}}

2010-06-14 Fertilizer Application

2012-06-15 Fertilizer Application applied 28% Nitrogen liquid at 110.000 Lbs N/acre [Jim Bronson email]

2012-06-22 Fertilizer Application Comments: This was a supplemental application added because we did not hit our target rate with the first sidedress application. Shooting for about 190 lbs N/acre total for the year, we applied about 197 lbs N/acre on this field.

2009-05-26 Mechanical Weed Control

2009-05-05 Fertilizer Application 45 acres on the monitor.

2009-07-03 Fertilizer Application Time reflects road travel and spray time

2010-05-04 Fertilizer Application

2011-04-14 Fertilizer Application Fert Spreader (RENTAL in fert cost), Custom Fert (7-18-37) from HFB

2011-05-06 Mechanical Weed Control

2011-05-12 Planting No refuge planted by agreement through Robertson's group. Monitor read 40.5 planted acres.

2011-05-13 Mechanical Weed Control

2011-06-15 Fertilizer Application sprayed north east corner from old feed bunk south to just south of sod waterway to the east edge,and one sprayer width on west side of field to the sod waterway on the big hill

2011-06-21 Fertilizer Application

2012-05-07 Mechanical Weed Control applied herbicide with Demco 'Starquest' Sprayer Lumax per qt 2.500 Qt Atrazine per Qt 0.500 Qt Gramoxone Inteon 2.000 Pint Preference surfactant 2.350 Oz

2012-04-05 Planting Old grass and legume seed planted. Seeding rate a guess. Seeding bare portion of NW corner of field which was abandoned last year due to erosion. Several drill passes at high seeding rate to get sod for erosion control.

2012-05-06 Mechanical Weed Control After planting.

2012-06-15 Fertilizer Application

2012-06-14 Fertilizer Application

2002-04-20 Soil Preparation Soil finished main site treatment 3; Please see notes below for specific dates plots were soil finished; April 19, 2002 soil finished T3, reps: 1 and 2; April 20, 2002 soil finished T3, reps: 3, 6, 4, and 5; Each plot was taking about 30 minutes to soil finish each plot (the 30 minutes did not include a headland pass on each end of each plot); Did not do the headland pass because we plan to soil finish these plots again before planting; Working depth: about 4 inches.

2002-04-25 Soil Preparation Soil finished main site treatments 3 & 4 rep 6 only. Soil finished European Corn Borer Study and 2,4-D studies.

2002-05-01 Soil Preparation Soil finished the nitrogen rate study, all corn, soybean, and spring fallow plots in the biodiversity study (trt's B2, B4, B5, B7, B8, B10, B11, B12, B13, B15, B16, B18, and B19).

2002-04-17 Soil Preparation Chisel plowed T1 plots. Please see notes below for specific dates each plot was chisel plowed. April 17, 2002 chisel plowed T1 reps: 3, 2, and 1; April 18, 2002 chisel plowed T1 reps: 5, 4, and 6; The chisel plow was set at the depth of 6-7 inches; Each plot was taking about 50 minutes to chisel plow.

2000-06-06 Soil Preparation Disked T7 micro-plots, all reps, reps: 6, 1, 5, 3, 4, and 2. Not sure what tractor but I am sure we used the JD 7600 tractor.

2002-04-16 Soil Preparation Chisel plowed N-rate study and the bulk area next to the N-rate study;

2002-04-16 Soil Preparation Chisel plowed all corn, soybean, and spring fallow plots in the biodiversity study.

2002-04-19 Soil Preparation Soil finished main site treatment 1 and 4; Please see notes below for specific dates plots were soil finished; April 19, 2002 soil finished T1, reps: 6, 1, 5, 2, 3, and 4; April 19, 2002 soil finished T4, reps: 6, 1, 4, and 2; April 20, 2002 soil finished T4, reps: 3 and 5; Each plot was taking about 30 minutes to soil finish each plot (the 30 minutes did not include a headland pass on each end of each plot); Did not do the headland pass because we plan to soil finish these plots again before planting; Working depth: about 4 inches.

2002-04-24 Soil Preparation Because of high numbers of curly dock (Remex crispus L.) main site treatments 3 & 4 replication 6 only were chisel plowed for the second time during the spring of 2002. Chisel plowed European Corn Borer Study and 2,4-D Ester / Microbial Change Study.

2002-04-25 Soil Preparation Chisel plowed and soil finished the micro plots in all reps of main site treatment 7.

2002-04-25 Soil Preparation Chisel plowed and soil finished the micro plots in all reps of main site treatment 7.

2002-05-07 Soil Preparation Soil finished and planted corn in the N-rate study; The variety of corn planted was Pioneer 35Y54; Seeding rate was 28K seeds/A; The insecticide Lorsban (chlorpyrifos) was applied at planting; Most of the time Lorsban was put on at 8 - 8.7 lbs/A; Not sure if we put 19-17-0 on at planting to all treatments except the zero nitrogen treatment?

2002-05-08 Soil Preparation Soil finished T1 plots; Please see notes below for specific dates each plot was soil finished; May 6, 2002 soil finished T1, rep 6 only, It started to rain (0.2") today so we stopped all field work; May 8, 2002 soil finished T1, reps, 3, 2, and 4, It started to rain (0.45") today so we stopped all field work. May 10, 2002 soil finished T1, reps, 5 and 1; The soil finisher was set at a working depth of 4 inches.

2002-04-18 Soil Preparation Chisel plowed T4 plots, all reps, reps: 4, 6, 1, 2, 3, and 5; Each plot was taking about 50 minutes to chisel plow. Depth: chisel plowing 6 - 7 inches deep; Speed: 4.3 - 4.5 mph; Tractor Gear: B2 and B3.

2002-04-19 Soil Preparation Chisel plowed T3 plots. Please see notes below for specific dates each plot was chisel plowed. April 18, 2002 chisel plowed T3, reps: 4 and 5; April 19, 2002 chisel plowed T3, reps: 1, 2, 3, and 6; The chisel plow was set at the depth of 6-7 inches. Each plot was taking about 50 minutes to chisel plow.

2009-05-05 Herbicide Application Marshall GLBRC Fields Sprayed for weeds prior to soybean planting

2009-05-07 Herbicide Application Completion of M2 Spraying

2009-05-29 Herbicide Application Spraying prior to soybean planting

2009-05-26 Herbicide Application Spraying prior to soybean planting

2009-06-16 Herbicide Application Spraying GLBRC Scaleup Soybean fields

2009-07-03 Herbicide Application Sprayed marshall farms for weed control

2009-07-24 Herbicide Application Sprayed Lux arbor

2009-07-25 Herbicide Application Sprayed lux arbor

2009-08-12 Herbicide Application Sprayed Marshal farms

2013-04-17 Fertilizer Application Applied Bulk Dry Fertilizer Blend

2013-06-27 Herbicide Application Sprayed Corn with Status and Roundup

2014-11-25 Mowing Flail mowed corn stalks

2015-05-14 Mechanical Weed Control applied herbicide

2013-05-11 Herbicide Application Sprayed Corn

2014-04-10 Fertilizer Application Applied Dry Fertilizer to M1

2013-05-14 Herbicide Application Sprayed Corn in M1

2015-06-22 Fertilizer Application Applied Nitrogen Fertilizer to Corn (Recorded in pounds of N per acre)

2016-04-23 Herbicide Application Burndown herbicide prior to corn planting

2016-06-02 Herbicide Application Sprayed herbicide on corn. Reported 0.285 pint/acre

2016-06-11 Herbicide Application Sprayed corn to control pokeweeds. NIS surfactant at 0.285 pint/acre

2013-04-22 Fertilizer Application Applied custom blend of dry fertilizer

2013-05-09 Herbicide Application Sprayed pre-emergent herbicide on corn field

2013-06-28 Herbicide Application Sprayed to control perennial weeds

2014-11-25 Mowing Fail mowed

2015-04-30 Herbicide Application Sprayed pre-emergent herbicide on corn field

2015-06-01 Herbicide Application Sprayed corn field to control perennial weeds

2016-04-22 Herbicide Application Burndown herbicide application

2016-06-01 Herbicide Application Sprayed corn to control post emerge weeds NIS surfactant at 0.285 pint/acre.

2019-12-17 Harvest test

2017-04-24 Herbicide Application Burndown herbicide applied prior to corn planting in M1. Sunny and warm, wind from the east between 4-6 mph.

2017-06-06 Herbicide Application Applied post emerge herbicide application between the 6th and 7th of June. sprayed L1 and M1 from tool shed to east by noon on 06/06/2017 sprayed from tool shed to the west 06/07/2017 615 am wind got to high to finish on the 6th. Used 15 gallons water per acre as carrier

2017-06-12 Fertilizer Application Applied sidedress fertilizer to corn, using Coulter between rows.

2017-06-27 Herbicide Application Applied herbicide to L1 field to control escape weeds.