Name: 3 bottom plow

1988-05-09 Soil Preparation {{PL: Jim had one of his crew begin to plow the ancillary site this evening. Appropriate plots of Rep 1 (the ”Demonstration” Rep) were plowed with the MF 298 and the 3-bottom plow. }}